top of page

PROJECTS

Umm Al Dome 

Petroserv-Strukton JV

We installed the traffic signage and road marking for the completion of main upgrading works on Umm Al Dome, Al-Muaither, and Al Innabi Streets and their opening to traffic, as part of Umm Al Dome Street Improvement Project in Muaither area.

Umm Al dome / Petroserv Stratton JV.jpg

Lusail LRT

QDVC

Operations and maintenance of the work zones for Lusail LRT.

The Lusail LRT is a light rail network as part of the Lusail urban development.

Lusait LRT - QDVC.jpg

Al Khor Expressway

Tekfen

Design and Implementation of Traffic Diversion Plans for Al Khor Expressway, a new 10 lane highway with 10 intersections, as well as a number of viaducts, overpasses and underpasses.

Al Khor Expressway - Tekfen.jpg

West Corridor

J&P

Bike lane near East-West Corridor, which will connect all 8 stadiums built for the Qatar 2022 FIFA World Cup, as well as fan zones, residential areas, markets, tourist sites and Hamad International Airport.

bycicle lane.png

New Orbital Highway

QDVC - Bin Omran JV

The New Orbital Highway Contract 2 (NOH2) stemmed from the intention to bypass Doha City by connecting Salwa Road and North Relief Road. NOH2 consists of 10 lanes (5 in each direction) for light vehicles with additional Collectors and Distributor roads. Four separate dedicated truck lanes (2 in each direction) run parallel to the Orbital from Salwa Road to Junction 5 where a 320m long cut and cover tunnel splits away from the light vehicle carriageway towards Junction 12 Dukhan interchange.​​

Screenshot 2021-02-23 at 13.51.56.png

Interchange IC3

Redco-Porr JV

TMS created a contraflow configuration at G-Ring Road to enable the construction works for the new Interchange IC3 at Ras Bu Fontas Free Zone, Southwest of Hamad International Airport (HIA).

Interchange IC3.jpg

Framework Contract

Infraroad

TMS installed the traffic signs and road markings for the Inner Doha and Outer Doha Framework Contracts.

Framework Contract - Infraroad.jpg

Electric Vehicle Parking

Infraroad

Electric Vehicle Parking. Client: Kahramaa. Description: Electric Vehicle Charging Point marking for Kahramaa (Water & Electricity) at Abu Hamour, Doha (Qatar)

Electric Vehicle Parking.jpg

Al Gewan Island

Midmac-Porr JV

Traffic Management services for the construction of Gewan Island's entrance cable-stayed bridge. 
The 250-meter long bridge, which rests on two pylons 43 meters above The Pearl-Qatar’s Boulevard, will connect the Lusail Expressway and The Pearl-Qatar’s Boulevard to Gewan Island.

Al Gewan Island.jpg

Falcon Air Base

UCE

Road Marking works at the air base for all the Falcon-3 Facilities and infrastructure in Doha.

Post 92 Instagram_edited.jpg

Red Line North

RLR JV

TMS assisted in completing the Red Line Metro project on time for the last 5 years. 

RLR JV and TMS achieved Over a major safety milestone in the traffic management industry, having completed over 1 million hours of temporary traffic management without lost time due to injury.

Red%20Line%20North_edited.jpg

New Orbital Highway

J&P

Traffic Management Services for Al Majd Road (New Orbital Highway), the longest highway in Qatar, running at a length of 195 km.

post%2021%20Linkedin_edited.jpg

Bridge Inspections

WSP

Traffic Management services for infrastructure inspection on bridges along Doha.

Bridge%20inspections%20Doha_edited.jpg

Al Bustan South

Hyundai

Traffic management services, Road Safety Audits, Design of Traffic Diversion Plans, Traffic Signage and Road Marking for Sabah Al Ahmad Corridor, which extends from Hamad International Airport (HIA) to Umm Lekhba Interchange (Landmark Interchange)

Al bustan South.jpg

Qatar Armed Forces

Topgrade

Helipad marking for Qatar Armed Forces.

post 102 instagram.png
bottom of page